Sprint Testing Workflow
Need a sprint cadence: planning → setup → execution → regression → stabilize → review.
StatusStable
TypeWorkflow Skill
DomainQuality workflow
SDLCTesting workflow
Good forQA / PM
LanguageChinese / English
EvalsEvals ✓
Synced2026-09-15
Why this Skill
It turns this Skill's method into a quality input that can be executed, reviewed, and reused.
- Own iteration phases and exit evidence; hand full artifacts to type skills.
- Gates and DoD must be checkable.
- On scope change, re-rank and state gate impact.
- Do not write a day diary with no gates.
When to use
Use this Skill
- Need a sprint cadence: planning → setup → execution → regression → stabilize → review.
- Need iteration gates and DoD with handoffs to type skills—not a one-off testing task.
Common pitfalls
- Do not write a day diary with no gates.
- Do not dump full case bodies during planning.
- Do not claim regression passed while development is still open-ended.
- Do not replace exit evidence with “we tested a lot”.
Input
Minimum Input
- The current task scope, objective, and subject under review.
Recommended Input
- Before producing output, read and follow prompts/sprint-testing-workflow.md.
- For step ↔ handoff mapping: read reference.md.
- For stage deep-dives: invoke the matching type skill; do not expand full artifacts here.
- Templates: output-templates/.
Optional Context
- Relevant code or configuration
- Historical results
- Logs and metrics
Output
The output follows this Skill's method and makes facts, assumptions, risks, and next steps explicit.
These are the Skill's expected output requirements, not evidence that it ran in a real project.
- 01Followed the main prompt’s output structure
- 02Includes stage position, gate board, exit-criteria check, next skill
- 03High-risk items have priority and Owner
- 04Did not invent details the user did not provide
View full output structure
- 05Assumptions, tradeoffs, and carryover are marked
How It Works
- 01Read and follow prompts/sprint-testing-workflow.md (stages, gates, DoD, handoffs).
- 02Add sprint goal, story scope, capacity, and carryover defects that change the plan.
- 03After locating the stage, hand off by skill name per reference.md; no relative-path links to other skill internals.
- 04If input is incomplete, draft a usable sprint test plan and mark assumptions and gaps.
Install & Quick Start
Install command / SHELL
npx skills add \
https://github.com/naodeng/awesome-qa-skills/tree/main/skills/en/testing-workflows/sprint-testing-workflow
-gsprint-testing-workflow.prompt
@skill sprint-testing-workflow
Using the current project context, produce an actionable result following this Skill.
Additional context:
[Paste project context or requirement]---
name: sprint-testing-workflow
description: Use this skill when you need a sprint-based QA workflow from planning through review and retrospective; triggers include sprint testing workflow and iteration QA workflow.
---
# Sprint Testing Workflow
**Chinese version:** See the corresponding Chinese skill.
## When to Use
- Need a sprint cadence: planning → setup → execution → regression → stabilize → review.
- Need iteration gates and DoD with handoffs to type skills—not a one-off testing task.
## Workflow
1. Read and follow `prompts/sprint-testing-workflow.md` (stages, gates, DoD, handoffs).
2. Add sprint goal, story scope, capacity, and carryover defects that change the plan.
3. After locating the stage, hand off by skill name per `reference.md`; no relative-path links to other skill internals.
4. If input is incomplete, draft a usable sprint test plan and mark assumptions and gaps.
## Core Constraints
- Own iteration phases and exit evidence; hand full artifacts to type skills.
- Gates and DoD must be checkable.
- On scope change, re-rank and state gate impact.
- No relative-path links to other skill files.
## Progressive Disclosure
- Before producing output, read and follow `prompts/sprint-testing-workflow.md`.
- For step ↔ handoff mapping: read `reference.md`.
- For stage deep-dives: invoke the matching type skill; do not expand full artifacts here.
- Templates: `output-templates/`.
## Pre-delivery Checklist
- [ ] Followed the main prompt’s output structure
- [ ] Includes stage position, gate board, exit-criteria check, next skill
- [ ] High-risk items have priority and Owner
- [ ] Did not invent details the user did not provide
- [ ] Assumptions, tradeoffs, and carryover are marked
## Common Pitfalls
- Do not write a day diary with no gates.
- Do not dump full case bodies during planning.
- Do not claim regression passed while development is still open-ended.
- Do not replace exit evidence with “we tested a lot”.