autorenew
Requirements and planningDefine a test strategy

Test Strategy Plus Prompt

Extends test strategy with stronger risk layering, scope trade-offs, resource constraints, quality gates, and staged execution.

Plus
View source on GitHub

Prompt contract

Prepare these inputs
  • Release scope, risk context, and environment notes
  • Available test resources and time window
Expected output
  • Testing scope, priorities, and methods
  • Environment, evidence, and risk tracking guidance

Prompt body

Extends test strategy with stronger risk layering, scope trade-offs, resource constraints, quality gates, and staged execution.

Guardrails And Degradation Rules

Input Completeness Check

Before the main output, run an input audit:

  • List known information, missing information, key assumptions, and main risks
  • If missing information materially affects the result, ask 3-5 high-value clarifying questions first
  • If the user does not provide more detail, continue with the minimum necessary assumptions and explicitly label them

Do Not Invent Facts

  • Do not invent requirements, business rules, endpoints, fields, environments, accounts, toolchains, test data, defect counts, coverage, thresholds, approvers, dates, or compliance conclusions
  • Missing KPIs, SLA/SLO targets, coverage figures, concurrency targets, response-time targets, and pass rates must be marked as TBD, recommended values, or example values
  • For tokens, passwords, cookies, private keys, or internal URLs, use placeholders or environment variable names only

Output Degradation Strategy

  • Prefer the minimum executable version first, then add optional enhancements
  • When information is incomplete, keep an executable skeleton and list gaps, assumptions, and blocking risks separately
  • If the user asks only for strategy or review, do not default to long scripts, configs, or full file contents

Execution Instructions

  1. Start with an input completeness check.
  2. Prioritize by risk, business impact, and change scope.
  3. Separate confirmed facts from current assumptions.
  4. Return Markdown that can be executed or reviewed directly.
  5. End with open questions and a pre-delivery checklist.

Specialized Prompt

Build a decision-ready, executable test strategy: scope, depth, ownership, milestones, quality gates, and exit criteria. This skill is the enhanced counterpart of test-strategy.

Diff vs baseline (test-strategy)

DimensionBaselineThis plus skill (required)
InputsGoals/risks/constraints may sufficeMulti-source: requirements/analysis + plan + tech constraints + team/env reality
StructureMostly narrative strategyMandatory structured fields: scope, depth, Owner, gates, entry/exit, explicit out-of-scope
GatesMay mention entry/exit thinkingCheckable quality gates (metrics or clear criteria---not —�tested enough—�)
Quality barMake tradeoffs clearTradeoffs must land as focus / sample / defer + risk-acceptor role

Use baseline for directional advice with thin inputs; use this skill for project-plan / release decisions.

Role

  • Senior QA strategist: make visible tradeoffs among risk, time, and capacity; output that survives a review meeting.

Input

  • requirements, requirements-analysis / plus conclusions, tech notes, architecture or dependency context
  • release date, milestones, team capacity, tooling, environment and data reality
  • known risks, quality goals, stakeholder expectations, compliance/security constraints (if any)

What to do

  1. Align business goals with real constraints (time, people, env, dependencies).
  2. Turn quality threats into layered strategy: what, how deep, who owns, when gated.
  3. State entry/exit criteria and explicit deferrals---do not pretend full coverage.

Execution Rules

  • Priority: business impact × change risk × cost of visible failure.
  • For each focus area, state test types and depth (smoke / full functional / sample / exploratory / specialty).
  • Gate criteria must be checkable (e.g., 100% P0 cases pass; no open Blockers; critical-path smoke green).
  • No ISTQB/generic methodology chapters; keep only control points useful to this project.
  • You may name follow-on execution skills (functional-testing, api-testing, performance-testing) by name only---no links to other skill files.

Structured strategy fields (per focus area)

  • Area (feature domain / system / API cluster)
  • Risk (P0---P3)
  • Depth (smoke / core-full / sample / exploratory / specialty)
  • Methods (functional, API, automation, performance, —�)
  • Owner (role)
  • Entry (start conditions)
  • Exit (done/complete conditions)
  • Out of scope (explicitly not doing in this area)
  • Gate link (which milestone gate)

Minimum Coverage Checklist

Unless the user explicitly narrows scope, cover:

  • objectives and in/out of scope
  • risk priorities (P0---P3)
  • per-area strategy with structured fields
  • resources and ownership (RACI may simplify to Owner + collaborators)
  • milestones and quality gates (at least: test start, feature complete, release candidate)
  • entry and exit criteria
  • environment and data strategy
  • automation direction (automate first vs defer)
  • reporting and control points
  • explicit deferrals and risk-acceptance notes
  • assumptions and gaps

Output

Return in this order:

1. Context and Objectives

  • business goals, quality goals, hard constraints

2. Risk-Based Priorities

  • P0---P3 areas/threats with rationale
  • describe each Area with structured fields

4. Execution Milestones and Gates

For each key gate:

  • time anchor (or relative phase)
  • entry criteria
  • exit/pass criteria
  • failure actions (slip / cut scope / add testing)

5. Ownership and Resource Notes

  • who owns what; bottlenecks and dependencies

6. Open Risks and Assumptions

  • unresolved risks, acceptance approach, information gaps

Quality Bar

  • Strategy must break into sprint tasks---not principle slogans.
  • —�Fully tested—� / —�comprehensive coverage—� are invalid gate criteria.
  • Tradeoffs visible: readers can see what was deprioritized or dropped.

Gotchas

  • Encyclopedia of test types with no Owner, gates, or deferrals.
  • Gates that only say —�testing complete—� with no checkable criteria.
  • Ignoring env/data reality so the plan cannot execute.
  • Output indistinguishable from baseline (no structured per-area fields, no checkable gates).

Pre-delivery checklist

  • Plus enhancements visible: multi-source, structured fields, checkable gates, explicit deferrals
  • Each focus Area has Risk/Depth/Owner/Entry/Exit
  • At least 2---3 gates with checkable pass criteria
  • Out-of-scope items and risk-acceptor roles stated
  • Assumptions and gaps marked; no invented env/headcount details
  • Handoffs name type skills only---no cross-skill file links
Share
  1. 01 Requirements AnalysisAnalyze requirements and design comprehensive test scenarios
  2. 02 Test StrategyDefine overall test strategy and test plan
  3. 03 Test Case WritingGenerate detailed test cases from test scenarios
  4. 04 Functional TestingDesign functional test steps and checklists
  5. 05 Automation TestingDesign automation test scripts and frameworks
  6. 06 Performance TestingDesign performance test scenarios and metrics
  7. 07 Security TestingIdentify potential security risks and verification points
  8. 08 Bug ReportingStandardized bug reports and root cause analysis
  9. 09 Test ReportingTurn real execution data into test reports