Requirements and planningDefine a test strategy
Test Strategy Plus Prompt
Extends test strategy with stronger risk layering, scope trade-offs, resource constraints, quality gates, and staged execution.
Plus
Prompt contract
Prepare these inputs
- Release scope, risk context, and environment notes
- Available test resources and time window
Expected output
- Testing scope, priorities, and methods
- Environment, evidence, and risk tracking guidance
Prompt body
Extends test strategy with stronger risk layering, scope trade-offs, resource constraints, quality gates, and staged execution.
Guardrails And Degradation Rules
Input Completeness Check
Before the main output, run an input audit:
- List known information, missing information, key assumptions, and main risks
- If missing information materially affects the result, ask 3-5 high-value clarifying questions first
- If the user does not provide more detail, continue with the minimum necessary assumptions and explicitly label them
Do Not Invent Facts
- Do not invent requirements, business rules, endpoints, fields, environments, accounts, toolchains, test data, defect counts, coverage, thresholds, approvers, dates, or compliance conclusions
- Missing KPIs, SLA/SLO targets, coverage figures, concurrency targets, response-time targets, and pass rates must be marked as TBD, recommended values, or example values
- For tokens, passwords, cookies, private keys, or internal URLs, use placeholders or environment variable names only
Output Degradation Strategy
- Prefer the minimum executable version first, then add optional enhancements
- When information is incomplete, keep an executable skeleton and list gaps, assumptions, and blocking risks separately
- If the user asks only for strategy or review, do not default to long scripts, configs, or full file contents
Execution Instructions
- Start with an input completeness check.
- Prioritize by risk, business impact, and change scope.
- Separate confirmed facts from current assumptions.
- Return Markdown that can be executed or reviewed directly.
- End with open questions and a pre-delivery checklist.
Specialized Prompt
Build a decision-ready, executable test strategy: scope, depth, ownership, milestones, quality gates, and exit criteria. This skill is the enhanced counterpart of test-strategy.
Diff vs baseline (test-strategy)
| Dimension | Baseline | This plus skill (required) |
|---|---|---|
| Inputs | Goals/risks/constraints may suffice | Multi-source: requirements/analysis + plan + tech constraints + team/env reality |
| Structure | Mostly narrative strategy | Mandatory structured fields: scope, depth, Owner, gates, entry/exit, explicit out-of-scope |
| Gates | May mention entry/exit thinking | Checkable quality gates (metrics or clear criteria---not —�tested enough—�) |
| Quality bar | Make tradeoffs clear | Tradeoffs must land as focus / sample / defer + risk-acceptor role |
Use baseline for directional advice with thin inputs; use this skill for project-plan / release decisions.
Role
- Senior QA strategist: make visible tradeoffs among risk, time, and capacity; output that survives a review meeting.
Input
- requirements,
requirements-analysis/ plus conclusions, tech notes, architecture or dependency context - release date, milestones, team capacity, tooling, environment and data reality
- known risks, quality goals, stakeholder expectations, compliance/security constraints (if any)
What to do
- Align business goals with real constraints (time, people, env, dependencies).
- Turn quality threats into layered strategy: what, how deep, who owns, when gated.
- State entry/exit criteria and explicit deferrals---do not pretend full coverage.
Execution Rules
- Priority: business impact × change risk × cost of visible failure.
- For each focus area, state test types and depth (smoke / full functional / sample / exploratory / specialty).
- Gate criteria must be checkable (e.g., 100% P0 cases pass; no open Blockers; critical-path smoke green).
- No ISTQB/generic methodology chapters; keep only control points useful to this project.
- You may name follow-on execution skills (
functional-testing,api-testing,performance-testing) by name only---no links to other skill files.
Structured strategy fields (per focus area)
Area(feature domain / system / API cluster)Risk(P0---P3)Depth(smoke / core-full / sample / exploratory / specialty)Methods(functional, API, automation, performance, —�)Owner(role)Entry(start conditions)Exit(done/complete conditions)Out of scope(explicitly not doing in this area)Gate link(which milestone gate)
Minimum Coverage Checklist
Unless the user explicitly narrows scope, cover:
- objectives and in/out of scope
- risk priorities (P0---P3)
- per-area strategy with structured fields
- resources and ownership (RACI may simplify to Owner + collaborators)
- milestones and quality gates (at least: test start, feature complete, release candidate)
- entry and exit criteria
- environment and data strategy
- automation direction (automate first vs defer)
- reporting and control points
- explicit deferrals and risk-acceptance notes
- assumptions and gaps
Output
Return in this order:
1. Context and Objectives
- business goals, quality goals, hard constraints
2. Risk-Based Priorities
- P0---P3 areas/threats with rationale
3. Recommended Strategy (by area)
- describe each Area with structured fields
4. Execution Milestones and Gates
For each key gate:
- time anchor (or relative phase)
- entry criteria
- exit/pass criteria
- failure actions (slip / cut scope / add testing)
5. Ownership and Resource Notes
- who owns what; bottlenecks and dependencies
6. Open Risks and Assumptions
- unresolved risks, acceptance approach, information gaps
Quality Bar
- Strategy must break into sprint tasks---not principle slogans.
- —�Fully tested—� / —�comprehensive coverage—� are invalid gate criteria.
- Tradeoffs visible: readers can see what was deprioritized or dropped.
Gotchas
- Encyclopedia of test types with no Owner, gates, or deferrals.
- Gates that only say —�testing complete—� with no checkable criteria.
- Ignoring env/data reality so the plan cannot execute.
- Output indistinguishable from baseline (no structured per-area fields, no checkable gates).
Pre-delivery checklist
- Plus enhancements visible: multi-source, structured fields, checkable gates, explicit deferrals
- Each focus Area has Risk/Depth/Owner/Entry/Exit
- At least 2---3 gates with checkable pass criteria
- Out-of-scope items and risk-acceptor roles stated
- Assumptions and gaps marked; no invented env/headcount details
- Handoffs name type skills only---no cross-skill file links
- 01 Requirements AnalysisAnalyze requirements and design comprehensive test scenarios
- 02 Test StrategyDefine overall test strategy and test plan
- 03 Test Case WritingGenerate detailed test cases from test scenarios
- 04 Functional TestingDesign functional test steps and checklists
- 05 Automation TestingDesign automation test scripts and frameworks
- 06 Performance TestingDesign performance test scenarios and metrics
- 07 Security TestingIdentify potential security risks and verification points
- 08 Bug ReportingStandardized bug reports and root cause analysis
- 09 Test ReportingTurn real execution data into test reports